Shelf Assembly to Top Assembly

26 Jan

Those are not plugged screws. I ran dados in the legs to hold the shelf up securely, then used a dowelling jig to insert 2″ long walnut dowels through the leg to the shelf. The legs attach to a walnut strip above with to vertical dowels.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s